Assessing Building Performance
The building performance evaluation (BPE) framework emphasizes an evaluative stance throughout the six phases of the building delivery and life cycle: (1) strategic planning/needs analysis; (2) program review; (3) design review; (4) post-construction evaluation/review; (5) post-occupancy evaluation; and, (6) facilities management review/adaptive reuse.
The lessons learned from positive and negative building performance are fed into future building delivery cycles. The case studies illustrate how this basic methodology has been adapted to a range of cultural contexts, and indicates the positive results of building performance assessment in a wide range of situations.
Random Posts
- Apache Server 2 Bible
- Tips And Traps When Buying A Home
- Windows Vista in a Nutshell: A Desktop Quick Reference - O’Reilly
- TIME Magazine March 31, 2008 Vol. 171 No. 13
- Creating Emotion in Games: The Craft and Art of Emotioneering (New Riders Games)
- Preparing for the Project Management Professional Certification Exam third Edition
- Symantec AntiVirus Corporate Edition 10.1.5.5000 Client for Windows
- Convergence in Broadcast and Communications Media
- Timing for Animation
- The Power of Culture Driving Todays Organisation
















