Assessing Building Performance
The building performance evaluation (BPE) framework emphasizes an evaluative stance throughout the six phases of the building delivery and life cycle: (1) strategic planning/needs analysis; (2) program review; (3) design review; (4) post-construction evaluation/review; (5) post-occupancy evaluation; and, (6) facilities management review/adaptive reuse.
The lessons learned from positive and negative building performance are fed into future building delivery cycles. The case studies illustrate how this basic methodology has been adapted to a range of cultural contexts, and indicates the positive results of building performance assessment in a wide range of situations.
Random Posts
- Object Oriented Thought Process The 2nd Edition - Sams
- The Blog of War: Front-Line Dispatches from Soldiers in Iraq and Afghanistan
- Fedora 6 and Red Hat Enterprise Linux Bible - Wiley
- Professional Search Engine Optimization with PHP: A Developer’s Guide to SEO
- File System Forensic Analysis - Addison Wesley
- Google Hacks 3rd Edition
- Access 2007 Bible
- Oracle 10g RAC Grid, Services & Clustering
- Beginning Linux Programming, 3rd Edition
- Windows IT Pro April 2007

















